Convert the live CPM into look-aheads and work-front priorities the field can use this week and next, without creating a second schedule.
C02 — The problem
The technical problem
Sites often run a whiteboard sequence that has no relationship to the CPM. Crews are productive on work that is not driving completion, while the critical path waits on access or information.
Short-Term Planning is construction-management work: pull near-term activities from the live programme, expose constraints, and set work-front priorities for the coming weeks. It is not recovery of the whole remaining programme and not period progress measurement for the controls report.
C03 — Engagement
When this capability is needed
-
01
Weekly / look-ahead cycle
The field needs a plan that still honours the CPM.
-
02
Work-front congestion
Several crews and only some available work.
-
03
After an update
Remaining logic changed and the site diary has not.
-
04
Interface weeks
Handovers in the near term will move the path if they slip.
C04 — Scope / method
How the work is approached
Near-term look-aheads, work-front availability, and constraint removal for a defined window (typically 2–6 weeks). Whole-project recovery and commissioning-closeout programmes are separate capabilities.
-
01
Slice the live CPM
Activities inside the look-ahead window, including predecessors that gate them.
-
02
Confirm work-front availability
Access, information, materials, and permits as constraints.
-
03
Prioritise against the driving path
Near-term work that protects completion, not only busy work.
-
04
Issue the look-ahead
A plan the field meeting can follow.
-
05
Feed constraints back
Items the planner and commercial team must act on.
C05 — Outputs
Typical deliverables
| Output | What it contains |
|---|---|
| Look-ahead schedule | Near-term activities from the live CPM. |
| Work-front / constraint list | What is available and what is blocking. |
| Weekly priority note | What must happen this cycle to protect the path. |
| Feedback to the update | Constraints that belong in the programme file. |
C06 — Decision value
What this work is used to decide
Which near-term work to resource, which constraints to escalate, and whether the site plan still matches the live path. It does not re-baseline the project.
C08 — Project environments
Relevant project environments
C09 — Who we support
Who commonly needs this capability
C10 — Boundaries
Important distinctions
Value Construction does not claim the contractor’s statutory safety or quality duty. Short-term planning coordinates sequence against the live programme.