Integrated control for capital projects

Value Construction is a construction and project-management consultancy focused on project controls, construction management, contracts, claims, cost, planning, and risk for capital projects.

Who we are

One connected control record

Value Construction connects schedule, cost, contracts, risk, change, construction execution, and management reporting. The aim is better project decisions through integrated technical and commercial control — not a stack of disconnected reports.

We advise owners and delivery teams. Value Construction is not a law firm, accounting firm, design engineer, or construction contractor.

Expertise

Integrated technical and commercial control

Each family is part of the same operating model. Use the service pages for the method, typical deliverables, and where the work sits in the project lifecycle.

Project Controls

The baseline, the live position, and the forecast kept as one record.

Planning & Scheduling

Performable programmes that can be updated against progress and change.

Cost Management

Budgets, commitments, and remaining cost held against the same baseline.

Construction Management

Site execution advised as part of the control system, not beside it.

Contract Management

Commercial instruments aligned with the work as it is actually performed.

Claims & Disputes

Entitlement and quantum built from the project record, not from after-the-fact narrative.

Risk Management

Uncertainty treated as a control input, not a separate register.

Method

How we work

Assignments follow the control cycle. Reporting exists to support decisions, not to replace them.

01

Plan

Agree what will be controlled before the baseline is treated as optional.

02

Baseline

Integrate schedule and cost into a performable starting position.

03

Monitor

Update progress, commitments, and change against that baseline.

04

Forecast

Recast remaining work, remaining cost, and residual risk.

05

Control

Act on variance while the project still has options.

06

Closeout

Leave a complete record of baseline, change, and actual performance.

Principles

How assignments are judged

One control record

Schedule, cost, change, and risk should describe the same project.

Evidence before narrative

Positions are built from the record the project actually keeps.

Technical and commercial together

Programme and contract positions are advised as connected work.

Change is managed

Variance is acted on while options remain, not accumulated into a late dispute.

Service areas

Defined by the assignment

Value Construction does not publish an office network or a geographic coverage list. Engagement is defined by the project and the control work required.

Owners

Capital-project owners who need an independent view of time, cost, and commercial exposure.

Delivery teams

PMC and project-management teams who need schedule, cost, and risk held as one system.

Commercial functions

Contract and claims work that has to stay connected to the live project record.

Adjacent lines

Value Training and Value Systems

These businesses support the same project-control discipline. They are not a substitute for the consultancy described above.

Value Training

Structured training sits alongside the consultancy. It is a complementary line, not the corporate identity.

Value Systems

Digital project-management methods and tools sit alongside advisory work. Value Systems is a complementary digital product line alongside advisory work.

Discuss a capital project

Contact Value Construction about project controls, planning, cost, construction management, contracts, claims, risk, training, or digital project-management solutions.

Scroll to Top