Capability

Claims & Disputes

Extension of Time

Prepare or respond to an extension-of-time submission from contemporaneous programmes, notices, and facts — a commercial package, not a method textbook.

Discuss Your Project View All Capabilities

C02 — The problem

The technical problem

Extension of Time is the contractual product: a request or determination of additional time under the instrument. Teams often confuse it with Time Impact Analysis (a method that may support the product) or with a rebuilt as-planned versus as-built story prepared years later.

This capability is the EOT assignment: frame the events, the notice position, the contemporaneous programmes, and the time requested or assessed. Outcomes are not promised. Legal strategy remains with counsel.

C03 — Engagement

When this capability is needed

  1. 01
    Prospective EOT

    Delay is running and a submission is due under the contract.

  2. 02
    Assessment

    An owner or PMC must determine an EOT with a technical basis.

  3. 03
    Rebuttal

    The other party’s EOT cannot be left unanswered on the programmes.

  4. 04
    Closeout

    Time relief still open and the record is ageing.

C04 — Scope / method

How the work is approached

Technical and commercial preparation or assessment of EOT. TIA, delay and disruption analysis, or quantum may be companion assignments. This assignment is the EOT product, not every delay method.

  1. 01
    Frame events and notices

    What is claimed, on what contract mechanics, with what contemporaneous notice.

  2. 02
    Assemble the programme record

    Which files were actually used, not which files look convenient now.

  3. 03
    Apply the agreed analysis method

    Often TIA or another method scoped separately; the EOT wraps the findings.

  4. 04
    State the time requested or assessed

    Against the contractual dates that matter.

  5. 05
    Hand to counsel / commercial lead

    Facts and exhibits, not a substitute legal opinion.

C05 — Outputs

Typical deliverables

Typical deliverables
Output What it contains
EOT narrative Events, mechanics, and time requested or assessed.
Programme exhibits Files and extracts used.
Notice and records map What exists and what is missing.
Summary for counsel Strengths and record gaps without predicting the tribunal.

C06 — Decision value

What this work is used to decide

Whether to submit, concede, assess, or contest time relief, and on what record. No outcome is guaranteed.

C07 — Parent service

Part of this service family

Part of: Claims & Disputes

C09 — Who we support

Who commonly needs this capability

C10 — Boundaries

Important distinctions

Technical EOT support does not replace appointed counsel or an expert appointment. Value Construction does not promise claim results.

C11 — Next step

Discuss your project

If this is the technical problem you are facing, talk to Value Construction about the work, the records required, and what you would receive. Outcomes are not guaranteed.

Discuss Your Project