Capability

Planning & Scheduling

Schedule Review & Assurance

Test a submitted or live programme for logic, density, calendars, constraints, and control readiness before it is treated as approved.

Discuss Your Project View All Capabilities

C02 — The problem

The technical problem

Approval is often a date on a letter, not a technical test. Open ends, negative float hidden by constraints, missing scope, and update procedures that cannot be followed are left in the file.

Schedule Review & Assurance is an independent technical read of a programme someone else built. The buyer needs to know whether that file is safe to baseline against, not whether a new programme should be written from scratch (that is Baseline Schedule Development).

C03 — Engagement

When this capability is needed

  1. 01
    Baseline submission

    An owner, PMC, or contractor needs a structured review before acceptance.

  2. 02
    Periodic assurance

    A live programme has drifted and needs a health check.

  3. 03
    Dispute or claim window

    The contemporaneous programmes must be characterised before analysis starts.

  4. 04
    Lender / governance review

    A third party needs a technical opinion on schedule quality.

C04 — Scope / method

How the work is approached

Review of logic, calendars, constraints, density, open ends, coding, completeness against known scope, and whether the file can be updated. The assignment may recommend rebuild; it does not automatically rebuild.

  1. 01
    Confirm the review basis

    Contract programme requirements and the file actually submitted.

  2. 02
    Test technical health

    Logic, open ends, lags, constraints, calendars, and float behaviour.

  3. 03
    Test control readiness

    Can progress and change be coded without breaking the model?

  4. 04
    Compare to known scope

    Missing areas, interfaces, and contractual milestones.

  5. 05
    Issue findings

    Accept, return with defects, or reject — with evidence, not adjectives.

C05 — Outputs

Typical deliverables

Typical deliverables
Output What it contains
Schedule review report Method, tests, and recommendation.
Findings register Defects ranked by effect on control and completion.
Technical checklist The tests applied, so the next submission can be compared.
Assurance note What the file can and cannot currently support.

C06 — Decision value

What this work is used to decide

Accept, return, or reject the programme as a control baseline. The review does not certify that the works will finish on the dates shown.

C09 — Who we support

Who commonly needs this capability

C10 — Boundaries

Important distinctions

Schedule review is not design certification, constructability sign-off, or delay analysis. It characterises the file in front of you.

C11 — Next step

Discuss your project

If this is the technical problem you are facing, talk to Value Construction about the work, the records required, and what you would receive. Outcomes are not guaranteed.

Discuss Your Project