Programme

Planning & Scheduling

Logic-linked programmes that can be performed, updated and recovered — a control instrument, not a kickoff decoration.

Discuss a Project

Why this matters

A programme the field cannot follow is not a plan.

Planning exists to sequence work, expose the critical path and give the project a baseline it can actually update. Software is a tool. The product is a credible remaining path.

What we do

A programme that survives progress and change

Baseline development, review, critical-path analysis, period updating, lookaheads, forecasting, recovery strategy and schedule assurance. This is not a Primavera training page.

Core service areas

What the programme must do.

  1. 01

    Baseline development

    A performable baseline, including constraints that are real rather than decorative.

  2. 02

    Schedule review and assurance

    Logic, density, lags and open ends tested before approval is treated as settled.

  3. 03

    Critical path

    What is driving completion, and what is float, each period.

  4. 04

    Progress updating

    Period updates from site evidence, not a global percent-complete slide.

  5. 05

    Lookahead

    Short-term plans derived from the live CPM the field can use.

  6. 06

    Forecasting

    Recalculate completion from current logic, not last month’s target.

  7. 07

    Recovery strategy

    Re-sequence or re-baseline with a record of why.

How we work

Build. Update. Recover.

  1. 01

    Basis

    Planning basis, calendars and coding before activity noise starts.

  2. 02

    Baseline

    Issue a logic-linked programme the project can perform against.

  3. 03

    Update

    Progress and remaining duration from contemporaneous evidence.

  4. 04

    Assure

    Test whether the live path is still credible.

  5. 05

    Recover

    Re-sequence with consequences made explicit.

Outputs

Files the project can update.

  • Planning basis / procedure

    How the programme is built, coded, updated and baselined.

  • WBS-aligned CPM programme

    Logic-linked schedule used as the time baseline.

  • Baseline file and register

    The approved version and later changes.

  • Period update pack

    Progress, remaining duration and critical-path movement.

  • Look-ahead schedules

    Short-term plans derived from the live CPM.

  • Recovery programme options

    Alternative paths with time consequences.

Relevant markets

Where delivery is decided

Industries

Related insight

From the project, not the brochure

Need a programme the project can actually follow?

Bring a baseline, update, or recovery constraint.

Discuss a Project

Scroll to Top